Completed (Final)
Sweetwater, FL 33172
Permit: C2025026497 · electrical
Estimated Cost
$1K
Project Details
Permit #
C2025026497
Type
electrical
Contractor
ALL PHASE ELECTRIC CORP
Issue Date
2024-11-25
Status
Completed (Final)
Estimated Cost
$1K
Description
ELECTRICAL
Other Permits at This Address
C2026047456 building WINDOWS
—
C2026071078 electrical ELECTRICAL
—
C2026071058 plumbing PLUMBING
—
C2026071073 mechanical MECHANICAL VENTILATION
—
C2025093455 building GENERAL (COUNTY) SINGLE ENTRANCE DOOR
$3,049
C2025159560 building WINDOWS
$48,605
C2025103008 building GRAVEL, SBS, SINGLE PLY, ETC. ASPHALT (FIBERGLASS) SHINGLE ROOFS
$73,335
C2025102841 building GRAVEL, SBS, SINGLE PLY, ETC. ASPHALT (FIBERGLASS) SHINGLE ROOFS
$73,333
C2025102541 building GRAVEL, SBS, SINGLE PLY, ETC. ASPHALT (FIBERGLASS) SHINGLE ROOFS
$73,333
C2025108868 building GRAVEL, SBS, SINGLE PLY, ETC. ASPHALT (FIBERGLASS) SHINGLE ROOFS
$73,333
About This Project
A $1K construction project has been permitted at Sweetwater, FL 33172 in miami-dade. The building permit (C2025026497) was issued on 2024-11-25 and is currently completed (final).
The project is being built by ALL PHASE ELECTRIC CORP. The scope of work includes: electrical.
The property is owned by REFERENCE ONLY.
The property is zoned 5000 with a land use designation of Reference Folio.
There are 10 additional permits on file for this property, which may indicate a multi-phase development or renovation history.